Work through a modelling case30 min
Solve a probability problem out loud15 min
Tell a story from your work2 min
Walk through your project10 min
Say each answer out loud, then open the fold.
Sharpe × √years = 1 × 2 = 2.0, so p is about 0.046. Tests and p-values
1 − 0.95²⁰, about 64%, and one false winner on average. Multiple testing
p below 0.05 / 20 = 0.0025, or t beyond about 3.02. Multiple testing
2% / √10, about 0.63%. Four times the days halves it. Samples and estimates
0.30 ± 1.96 × 2.0 / 5: from −0.48% to +1.08%. Zero is inside it. Confidence intervals
1.5 × 0.5 = 0.75, a loss of 25%. Prices and returns
I'd train a deep network on the whole history.It skips the baseline, so you can't tell whether it learned anything. And daily data gives a few thousand rows, little for a model with many weights.
It's 36.A bare number, right or wrong, shows nothing. They're grading the route, so say it as you go.
We decided, we built it, and we fixed it.They're hiring you. With "we" all the way through, they can't tell what you did.
The stack was Python, Postgres, Airflow and Docker.A list of tools isn't a decision. Say what you chose, what you turned down, and why.